Work the insulation in with your hands but do not compress or crush it.
Blow in insulation drop ceiling.
Cellulose blown in ceiling insulation is a good choice for diyers.
Maybe one or two rafter openings.
The best way to insulate a drop ceiling is to install batt insulation between the ceiling joists before installing the hanging grid.
Cut the insulation with the utility knife to fit.
Feed the insulation into the opening toward the wall using a pvc pipe or wooden pole maybe with a tee on the end to help push it.
Blown in cellulose has a higher r rating and is less expensive than either blown insulation like fiberglass attic insulation or fiberglass batts.
Position a strip of insulation between the ceiling joists paper side down.
Blown in fiberglass insulation doesn t settle after time has elapsed so if you blow in 16 5 of fiberglass it will remain at 16 5 of fiberglass.
Greenfiber blow in cellulose insulation fills gaps and voids to create an energy saving thermal blanket that can lower heating and cooling costs by 25 and reduce sound power by 60.
Purchase roll insulation to fit the cavity.
Blown in cellulose is an environmentally friendly material made from recycled newspaper so it s easier on your skin and lungs.
This installation would proceed as any insulation installation.
A bag of knauf insulation ecofill wx fiberglass blown in insulation costs 31 54 38 86 at home depot depending on prices at your local store.
Very very dusty when it is being blown in.
This will allow you to confirm spacing and depth of the insulation you can use.
After a few years blown in insulation tends to settle downward by a few inches which slightly reduces its overall thermal resistance known as r value because it leaves a small section at the.
Adding insulation to a dropped ceiling is a straightforward process but because the ceiling grid is somewhat hampering use 4 foot insulation batts instead of longer rolled batting.
If this is the case blown in insulation is a bad idea.
And if you would ever have to remove a tile and i am sure you will get out the wet dry vac.
Ignoring fire issues one could probably get away with plastic or insulation mesh stapled to or layed above the joists with cellulose then blown on top.
Start with a small section.